The opening of the King Abdulla Science and Technology College 65km north of Jeddah provided a number of logistical challenges. Not least the shipping of some 21,000m2 of elevated decking that included 1300m2 of 3m Mezzanine Floor.

TSG Project Managers and crew installed the systems on time and in challenging conditions. Inside structure temperatures reached 56oc with 100% humidity.